Dual Canopy Mechanic Electrical Engineering Co., Ltd. is one of the leading manufacturers and suppliers of OLTC Tester in China. Please feel free to wholesale discount products for sale here and get quotation from our factory. Customized orders are welcome.
What is OLTC Tester?

The OLTC Tester is a specialized diagnostic instrument designed to evaluate the performance and condition of On-Load Tap Changers (OLTCs) in power transformers. Unlike standard winding resistance testers that measure static resistance, the OLTC tester focuses on the dynamic behavior of the tap changer during its switching operation.
The OLTC is the only moving part connected to the transformer windings during operation and is statistically one of the most failure-prone components. This tester utilizes the dynamic resistance measurement method (also known as the "current method") to analyze the transition process between taps. By injecting a DC current and measuring the voltage drop across the winding during a tap change, it calculates the transition resistance and plots the resistance-vs-time waveform.
This analysis reveals critical mechanical and electrical issues such as contact wear, spring tension loss, insulation degradation, and timing deviations, enabling predictive maintenance and preventing catastrophic transformer failures
.
What are the technical features?
1.High-Speed Synchronous Sampling Technology
High Sampling Rate: Features high-speed A/D conversion capabilities (e.g., >10 kHz), enabling the precise capture of conversion process details at the millisecond level without missing any minute abnormal fluctuations.
Three-Phase Synchronization: Capable of simultaneously measuring the dynamic resistance of three-phase tap changers, allowing for a visual comparison of three-phase consistency and the detection of inter-phase discrepancies.
2. Comprehensive Parameter Analysis Functions
Switching Time: Precisely measures the time required for the tap changer to switch from one tap position to another.
Transition Resistance: Measures the peak resistance value during the switching process, reflecting the contact resistance of the transition contacts.
Waveform Feature Analysis: Automatically identifies key points on the waveform (e.g., start points, end points, peak points) and calculates various technical performance indicators.

What precautions should be taken for safe use?
1. Correct Wiring Procedure:
High-Voltage Side Measurement: Testing is typically performed on the high-voltage side windings of the transformer. The current clamps are placed at the beginning and end terminals of the high-voltage phase line (e.g., Phase A), while the voltage clamps are positioned on the inner side of the current clamps.
Low-Voltage Side Short-Circuiting: To establish a complete circuit, the corresponding terminal on the low-voltage side of the phase under test must be reliably short-circuited (e.g., shorting terminals a and n).
Note: Incorrect wiring will result in a failure to establish a complete circuit or lead to distorted measurement data.
Tap Position Selection: Testing is typically conducted between two adjacent tap positions (e.g., positions 3 and 4); alternatively, the entire tap-changing process may be measured. The appropriate test positions must be selected based on the specific type of tap changer being used.
Current Range Selection: Select an appropriate test current based on the transformer's capacity and winding resistance. For large-capacity transformers, it is recommended to use a higher current (e.g., 3A or 5A) to improve the signal-to-noise ratio.
2. Test Process Monitoring
Operational Synchronization: The testing personnel must coordinate closely with the personnel operating the motorized tap-changer mechanism to ensure that the tap-changing action is accurately triggered while the test instrument is actively acquiring data.
Waveform Observation: Monitor the waveforms displayed on the screen in real-time. If any anomalies are observed (e.g., waveform discontinuities or excessive noise), immediately stop the test and inspect the wiring connections.
3. Environmental Constraints
Temperature Effects: Both the ambient temperature and the winding temperature can influence the measured resistance values. It is recommended to record the oil temperature or ambient temperature at the time of testing and to apply temperature correction during data analysis.
Sources of Interference: Avoid conducting tests in close proximity to strong sources of electromagnetic interference (such as high-current busbars that are currently in operation), or implement appropriate shielding measures.
How can the long-term, proper operation of the equipment be ensured?
1. Routine Maintenance
Test Lead Care: Test leads and clips are consumable components; after use, they should be neatly coiled to prevent breakage. Periodically inspect the contact surfaces of the clips for oxidation and clean the contact jaws.
Exterior Cleaning: Keep the instrument panel clean, and prevent oil or grease from entering the buttons or interface ports.
Battery Maintenance: If the unit is equipped with a built-in battery, it must be recharged periodically during periods of prolonged inactivity to prevent battery depletion and damage.
2. Periodic Maintenance
Annual Calibration: It is recommended to perform metrological calibration on the tester annually. Particular attention should be paid to calibrating the accuracy of the constant current source, voltage measurement, and time base.
Software Updates: Monitor for firmware updates released by the manufacturer, and upgrade the analysis software to support expanded tap changer model libraries and diagnostic functions.
FAQ
Q1: Why is the low-voltage side short-circuited during testing?
A: Dynamic resistance measurement requires injecting a DC current into the high-voltage winding. To establish a closed circuit-thereby allowing current to flow through the high-voltage winding-the corresponding terminals on the low-voltage side winding must be short-circuited. This principle is analogous to the wiring configuration used in a transformer short-circuit test.
Q2: How should the connections be made when testing a transformer with a YNd11 vector group?
A: For transformers with a YNd11 vector group, when testing the high-voltage side tap changer, one typically selects a high-voltage phase conductor (e.g., Phase A) as the measurement subject; the corresponding low-voltage winding (Phase a) must then be short-circuited. The specific wiring method depends on the location of the tap changer (whether on the high-voltage or low-voltage side) and the transformer's vector group; our technical manual provides detailed wiring diagrams for reference.
Q3: Will the testing process cause any damage to the transformer's insulation?
A: No. The DC current output by the tester is relatively low (typically 1A–5A), and the voltage is also very low; therefore, this constitutes a non-destructive test. It will not cause any damage to the transformer's main insulation, nor will it alter the mechanical state of the tap changer.
Hot Tags: OLTC Tester, China OLTC Tester manufacturers, suppliers, factory, transformer tap changer test equipment oltc tester, on load tap changer switch tester, Transformer On Load Tap Changer Tester
