Online Partial Discharge Inspection Instrument

Online Partial Discharge Inspection Instrument
Details:
Advanced Online Partial Discharge Inspection Instrument for continuous monitoring of HV assets. Features wireless UHF/TEV sensors, real-time alerts, trend analysis, and SCADA integration. Ensure 24/7 insulation safety for GIS, switchgear, and cables without shutdown.
Send Inquiry
Description
Send Inquiry

Dual Canopy Mechanic Electrical Engineering Co., Ltd. is one of the leading manufacturers and suppliers of Online Partial Discharge Inspection Instrument in China. Please feel free to wholesale discount products for sale here and get quotation from our factory. Customized orders are welcome.

 

 

 

What is an Online Partial Discharge Inspection Instrument?

 

The Online Partial Discharge Inspection Instrument is a permanently installed monitoring system designed to provide continuous, real-time surveillance of partial discharge (PD) activity in high-voltage assets. Unlike portable testers used for periodic spot-checks, this system offers a "24/7 security guard" for critical insulation assets.

It utilizes a network of permanently mounted sensors (UHF, TEV, HFCT, Ultrasonic) to detect PD signals, process them locally or centrally, and transmit data to a central server or cloud platform. This enables trend analysis, early warning, and predictive maintenance, allowing asset managers to move from reactive repairs to proactive management.

The system is engineered for non-intrusive installation (often without requiring a shutdown) and long-term reliability in harsh substation environments. It serves as a critical component of Smart Grid and Digital Substation initiatives, providing actionable insights into the health of GIS, switchgear, transformers, and cables

product-750-750

 

What are the corresponding parameters?

 

Frequency Band

20 kHz-300kHz

Mean sensitivity

>50dB

Center Frequency

II40kHz/IIA 80kHz

Output Interface

Standard BNC

Gain

40dB±1dB

Power Supply

12V/40mA DC

Dynamic Range

>80dB

Operating Temperature

-10℃~40℃

Peak Sensitivity

>70dB

Storage Temperature

-20℃~50℃

 

Where can it be used?

 

 

1. GIS (Gas-Insulated Switchgear) Permanent Monitoring
Continuous Internal Defect Monitoring: Permanently install UHF sensors at GIS inspection windows, waveguides, or phase-segregated busbars to continuously monitor internal discharge activity.
Trend Analysis: Record changes in discharge levels over time to identify the rate of insulation aging and predict remaining service life.
Unattended Substations: Suitable for remote or unattended substations, transmitting data to a central control center via remote communication links.
2. High-Voltage Switchgear (AIS) Online Inspection
Cabinet Monitoring: Install TEV (Transient Earth Voltage) sensors or ultrasonic sensors on the switchgear surface to monitor for contact overheating and surface discharge caused by contamination.
Busbar Monitoring: Monitor for partial discharge at busbar connections to prevent busbar faults.
Inspection Robot Integration: Can be integrated into intelligent inspection robots to enable mobile, online monitoring capabilities.
3. High-Voltage Cable System Monitoring
Long-Distance Monitoring: Install HFCT (High-Frequency Current Transformers) at cable grounding boxes or terminations to provide continuous monitoring of the entire cable line.
Joint Monitoring: Focus monitoring efforts on cable intermediate joints and terminations, which are high-risk areas for faults.
Fault Localization and Early Warning: Integrate TDR (Time Domain Reflectometry) technology to automatically calculate the distance to a fault whenever discharge is detected.
4. Transformers and Reactors
Neutral Point Monitoring: Permanently install HFCTs on the non-energized side of the transformer's neutral point to monitor for internal winding discharge.
Bushing Monitoring: Monitor the insulation condition of high-voltage bushings.
5. Intelligent Substation Integration
Data Fusion: Integrate partial discharge data with other parameters-such as temperature, SF6 gas pressure, and load current-to perform a comprehensive assessment of equipment condition.
SCADA/EMS Integration: Connect to the substation control layer via the IEC 61850 protocol to enable a unified, single-interface visualization of all data.

 

 

What services do you offer?

1. Solution Design: Based on the client's substation layout, equipment specifications (e.g., GIS models, cable lengths), and monitoring requirements, we design an optimal sensor layout scheme and network topology.
2. Feasibility Analysis: We provide on-site electromagnetic environment surveys to assess the feasibility of online monitoring and evaluate potential risks of interference.
3. System Integration: We provide interface integration solutions to connect with the client's existing SCADA, EMS, or asset management systems (supporting standard protocols such as IEC 61850).
4. Return on Investment (ROI) Analysis: We assist clients in evaluating the economic benefits derived from online monitoring (e.g., reduced manual inspection labor and the avoidance of losses resulting from major equipment failures).

20250613152229
 

 

FAQ

Q1: What is the fundamental difference between an online partial discharge monitoring system and a portable partial discharge tester?
A: The core distinction lies in the difference between "continuousness" and "immediacy."

A portable tester acts as an "instant snapshot"; it is suitable for periodic inspections, fault troubleshooting, and acceptance testing, providing highly precise diagnostic data. However, it cannot capture the evolution of faults that occur during the intervals between inspections.
An online monitoring system acts as a "continuous recording"; it is designed for the long-term supervision of critical equipment, capable of capturing intermittent discharges, recording discharge evolution trends, and providing early warnings. The two systems are complementary: once the online monitoring system detects an anomaly, portable instruments are typically used to perform precise localization and verification.
 

Q2: How long do the batteries in the wireless sensors last? What happens when they run out of power?
A: Our wireless sensors feature an ultra-low power consumption design, paired with high-capacity lithium-thionyl chloride batteries. Their designed lifespan is typically 5 to 10 years (depending on the data upload frequency). The system includes a battery level monitoring function; when the power level drops below a specific threshold, it automatically sends a "low battery alarm" to the monitoring center, alerting maintenance personnel to replace the batteries in advance and ensuring uninterrupted monitoring.

 

Q3: Is wireless transmission reliable in environments with strong electromagnetic interference (such as substations)?
A: It is highly reliable. We employ the following technologies to ensure communication quality:

Interference-Resistant Frequency Bands: We utilize frequency bands with excellent penetration capabilities and strong resistance to interference (such as Sub-1G LoRa or 2.4G frequency-hopping).
Self-Organizing Network Technology: We employ a mesh topology structure; if a specific communication path becomes obstructed, data can automatically reroute to an alternative path.
Data Caching: The sensors feature "resume-on-reconnect" and local storage capabilities; once communication is restored, any pending data is automatically transmitted, ensuring that no data is lost.

Hot Tags: Online Partial Discharge Inspection Instrument, China Online Partial Discharge Inspection Instrument manufacturers, suppliers, factory, Partial discharge test auxiliary accessories, online partial discharge analyzer, Partial Discharge Accessories Partial Discharge Equipment

Send Inquiry