Dual Canopy Mechanic Electrical Engineering Co., Ltd. is one of the leading manufacturers and suppliers of Short Circuit Impedance Of transformer in China. Please feel free to wholesale discount products for sale here and get quotation from our factory. Customized orders are welcome.
What is Short Circuit Impedance Of Transformer?
The Short-Circuit Impedance Tester for Transformers functions as a purpose-built instrument for quantifying short-circuit impedance (Uk%) and load loss (Pk) in power transformers. These measurements prove indispensable when judging whether a transformer can withstand the formidable mechanical forces generated during short-circuit events, and when validating that manufactured units align with their original design parameters.
Where DC resistance testing stops at the ohmic component, this instrument pursues the complete impedance picture. It energizes the primary winding with AC voltage at nominal power frequency while bolted short-circuit conditions prevail on the secondary side. The simultaneous capture of applied voltage, circulating current, and phase displacement yields precise calculations of impedance voltage percentage and load loss. Design engineers and field technicians leverage these results to forecast voltage drop under varying load conditions, estimate prospective fault current magnitudes, and gauge the transformer's thermal endurance and structural resilience during through-fault situations.
Modern implementations feature sophisticated phase-separation algorithms capable of teasing apart resistive and reactive contributions within the total impedance-even when ambient conditions include heavy magnetic fields from adjacent buswork or significant harmonic pollution on the supply. This robustness makes the tester equally valuable on factory floors during final acceptance testing, at substation sites during periodic maintenance cycles, and in forensic investigations following system disturbances.
What do the device parameters include?
|
Measuring Range |
Voltage: 20V~400V |
|
Electric Current: 0.5A~10A |
|
|
Accuracy |
Voltage,Curren: Level 0.2 |
|
Impedance: Level 0.5 |
|
|
Power: Level 0.5 (cosφ≥0.2) |
|
|
Size |
350mm×270mm×170mm |
|
Weight |
8kg |
- Environmental Temperature: -10℃~50℃
- Environmental Humidity: ≤85% RH
- Working Power Supply: AC220V±10%
- Power Frequency: 50±1Hz
What are the product's features and functions?
- 1. Three-Phase Synchronous Measurement Technology
Single Connection, Simultaneous Three-Phase Measurement: Modern test instruments typically feature a three-phase synchronous measurement capability. A single connection allows for the simultaneous measurement of three-phase impedance, significantly reducing testing time (achieving a speed increase of over 3 times compared to single-phase testing).
Elimination of Human Error: This approach avoids the variations in contact resistance and operational errors associated with multiple connections, thereby enhancing the comparability of three-phase data.
2. Precise Phase Separation and Harmonic Suppression
Phase Separation Technology: Utilizing DSP (Digital Signal Processing) technology, the instrument precisely isolates the fundamental components of voltage and current, effectively filtering out power supply harmonics and noise interference to ensure measurement accuracy even in adverse power grid environments.
Power Factor Measurement: Accurately measures the power factor (cosφ), thereby enabling the precise calculation of load loss (Pk).
3. Automatic Calculation and Evaluation
Automatic Uk% Calculation: Automatically calculates the percentage short-circuit impedance (Uk%) and directly displays the degree of three-phase imbalance.
Load Loss Correction: Automatically corrects the measured load loss to a reference temperature (typically 75°C) to facilitate comparison with standard values.
Evaluation Function: Features built-in evaluation logic that automatically alerts the user if the three-phase imbalance exceeds specified limits (e.g., >2% or >3%).
What points should be kept in mind during use?
**Wiring and Operation**
**Proper Short-Circuiting:** The opposite side of the winding under test (typically the low-voltage side) must be reliably short-circuited. The short-circuiting leads should be as short and thick as possible to minimize additional impedance and losses, thereby ensuring measurement accuracy.
**Wiring Method:** Connect the leads strictly in accordance with the provided wiring diagram. For three-phase testing, particular attention must be paid to the phase sequence and the connection of corresponding terminals; failure to do so will result in erroneous measurement results.
**Tap Changer Position:** Prior to testing, set the tap changer to the specified position (typically the principal tap) and record the setting. Adjusting the tap changer during the testing process is strictly prohibited.
**Eliminating External Influences:** During testing, every effort should be made to avoid interference from strong external magnetic fields. Test leads should be twisted together or shielded whenever possible to minimize the pickup of external interference.
What needs to be done for maintenance?
1. Routine Maintenance
Test Lead Inspection: Check the insulation of the high-current test leads to ensure it is intact; verify that the clips are secure and that the contact surfaces show no signs of oxidation.
Cooling System Cleaning: Keep the instrument's ventilation ports unobstructed and regularly remove accumulated dust.
Interface Protection: When not in use, cover the test terminals with their protective caps to prevent dust ingress.
2. Periodic Maintenance
Annual Calibration: It is recommended to perform metrological calibration annually. Priority should be given to calibrating the measurement accuracy of voltage, current, power, and phase.
Internal Inspection: Verify that the internal power supply module and power amplifier module are functioning correctly.
FAQ
Q1. Is single-phase injection acceptable, or do I need three-phase testing?
A:Single-phase injection (single-phase excitation, three-phase shorted) is widely accepted and standard for most field tests, per IEC 60076-1.
Three-phase testing is possible with specialized three-phase impedance test sets but is less common. Single-phase testing is sufficient for detecting changes in %Z and is recommended for portability and safety.
Q2. What accessories are required?
A:High-current shorting bars / shorting straps (low inductance).
Heavy-duty flexible copper cables (rated for test current).
Heavy-duty insulated clamps (e.g., C-clamps or battery-type clamps).
Temperature probe (for winding temperature estimation).
Tap changer position indicator.
Q3. How do you ensure safe operation during high-current injection?
A:Use double-insulated test leads with shrouded connectors.
Establish a safety perimeter and use remote control operation.
Ensure the transformer is fully de-energized and grounded before connection.
The test set must have automatic current limiting and emergency stop.
Shorting bars must be rated for full test current and securely fastened.
Never open the shorting circuit while current is flowing.