Primary Current Injection Equipment

Primary Current Injection Equipment
Details:
Introduction The Primary current injection equipment high current generator is mainly used by the company for the setting and calibration of various electrical equipment such as circuit breakers, fuses, switches, etc. Due to its reasonable design, convenient operation and large output power, it...
Send Inquiry
Description
Send Inquiry

Dual Canopy Mechanic Electrical Engineering Co., Ltd. is one of the leading manufacturers and suppliers of primary current injection equipment in China. Please feel free to wholesale discount products for sale here and get quotation from our factory. Customized orders are welcome.

 

What does "Primary Current Injection Equipment" refer to?

 

XD901S-1

Engineered for Precision. Built for the Field.

Our Primary Current Injection Equipment (also known as a primary injection test set or high-current test system) delivers stabilized, high-magnitude AC current-ranging from 500 A to 50 000 A-directly through the primary circuit of protective devices. This enables field engineers and laboratory technicians to verify the trip characteristics, contact resistance, and thermal withstand capability of:

Low-voltage and medium-voltage circuit breakers (ACB, MCCB, VCB, SF₆)

Current transformers (CTs) - ratio verification & saturation curve testing

Busbar joints and cable connections - micro-ohm contact resistance measurement

Protective relays (overcurrent, earth-fault) - end-to-end scheme validation

Welding bus systems & grounding grids - continuity and impedance testing

 

How should maintenance and servicing be carried out?

 

Interval Action Details
After each use Visual check Inspect cables for cuts, bus bars for discoloration, clamps for pitting
Monthly Clean ventilation grilles Compressed air (< 3 bar) to remove dust; clogged grilles raise winding temperature by up to 15 °C
Quarterly Tighten output terminals Torque to 25 N·m (M12) / 15 N·m (M10) per IEC 60947-1 Table 4
Annually Insulation resistance test Megger at 1 000 V DC between primary winding & enclosure; accept ≥ 100 MΩ (new unit: > 500 MΩ)
Annually Calibration verification Compare output current reading against a reference CT (Class 0.2S); adjust if deviation > 1 %
Every 3 years Full factory service Transformer oil (if oil-filled model): DGA test per IEC 60567; contact resistance of tap changer; firmware update

 

What are the critical precautions to observe before operating primary current injection equipment?

 

Verify input supply matches the unit's nameplate voltage (e.g., 380 V ± 10 %, 3-phase, 50/60 Hz). An incorrect supply can damage the tap-changer mechanism and void the warranty.

Inspect output connections for clean, tight contact surfaces. Loose connections generate heat - a 100 µΩ joint at 10 000 A dissipates 10 kW, enough to melt copper in seconds (P = I²R).

Ensure the device under test (DUT) is de-energized and isolated from the power system. Verify with a voltage detector compliant with IEC 61243-3.

Ground the equipment frame to the station ground grid using the dedicated green/yellow terminal (M8 bolt, minimum 10 mm² Cu conductor).

 

How can the device's precision performance be verified?

 

product-3219-2715

Input AC 50Hz, 220V.

Output single-phase 0-100A (200A, 500A, 1000A, 2000A, 3000A, 4000A, 5000A) AC current; the current can be adjusted smoothly and continuously, with an accuracy higher than 0.1 level;

The output current is a standard sine wave with small burrs, which is better than the power system requirement index standard, and the ripple factor is less than 0.3%.

Output current mode: true effective value is continuously adjustable;

Output waveform: standard sine wave;

Output opening voltage: 5V.

Current accuracy: each current can be adjusted smoothly and continuously, with an accuracy higher than 0.5 level. The current and voltage meter display is true effective value, with high accuracy and high stability; current stability: 0.1%; current waveform distortion: THD 1%;

Protection settings: overcurrent, overvoltage; the current action time of the measured component can be measured, and the locking action time can be recorded synchronously.

Normally open and normally closed contacts are automatically distinguished.

Time measurement range: 0.0001S---9999.9999S,

Accuracy: 0.0001S

Power: 3000VA (5000VA, 18KVA)

 

What kind of pre-sales services are provided?

 

Service What You Get
Technical Consultation Our application engineers help you select the right model based on your end-users' breaker ratings, CT ratios, and testing standards (IEC / IEEE / GB)
Custom Spec Sheet We prepare a co-branded datasheet (PDF, print-ready) with your company logo and contact details - ready for your sales team to distribute
Training Material Product training slide deck (PowerPoint, 45 slides) + demo video (MP4, 12 min) - localized in your language on request

 

How To Cooperate With Us?

Our address

Baoding Cloud Center, Hebei, China

Phone Number/whatsapp

+8613603329412

E-mail

dylan@dualcanopy.com

logo12
 

FAQ

 

 

Q1: What is the difference between primary current injection and secondary current injection testing?

A: Primary current injection passes high current (hundreds to tens of thousands of amps) directly through the primary side of the protected circuit - including the CT, wiring, and relay - simulating real fault conditions. Secondary injection feeds a small, calibrated current (typically 1 A or 5 A) directly into the relay's input terminals, bypassing the CT and wiring.

Primary injection is the only method that verifies the entire protection chain end-to-end, including CT ratio errors and wiring integrity. It is required by standards such as IEC 60255-151 for type testing and by many utilities for commissioning acceptance. Our equipment is purpose-built for this more demanding - but more comprehensive - test method.

 

Q2: Can I use this equipment on 60 Hz systems? What about different supply voltages?

A: Yes. All models are available in 50 Hz and 60 Hz versions. Input voltage options include 220 V single-phase, 380 V three-phase, and 415 V three-phase. If your end-users operate in multiple countries (e.g., Latin America at 60 Hz / 220 V, Middle East at 50 Hz / 415 V), we recommend the multi-voltage input option, which accepts 190–440 V, 45–65 Hz via an internal auto-ranging transformer.

 

Q3: How is the equipment packaged for international shipping, and what is the typical lead time?

A: Each unit is packed in a triple-wall corrugated carton with 20 mm PE foam cushioning, meeting ISTA 2A drop-test standards. A plywood crate is available for sea freight.

 

Hot Tags: primary current injection equipment, China primary current injection equipment manufacturers, suppliers, factory, ac resonant test system 75kva, Primary Current Injection Testing System, ac hipot tester resonance test

Send Inquiry