Hey there! I'm a supplier of energy-saving oil-immersed transformers. One question I get asked a lot is, "How long does it take to customize an energy-saving oil-immersed transformer?" Well, let me break it down for you.
Initial Consultation and Design Phase
First off, it all starts with a good chat. When a customer reaches out, we schedule an initial consultation. This is where we sit down (either in person, over the phone, or via video call) and figure out exactly what they need. They'll tell me about their power requirements, the environment where the transformer will be installed, and any specific features they're looking for.
This consultation can take anywhere from 30 minutes to a couple of hours, depending on how complex their needs are. After that, our design team gets to work. They use all the info we gathered to come up with a custom design for the transformer. This design phase usually takes about 1 - 2 weeks. We want to make sure everything is just right, so we double - check all the calculations and make sure the design meets all the relevant industry standards.
Material Procurement
Once the design is finalized, it's time to start getting the materials. Energy - saving oil - immersed transformers are made up of a bunch of different components, like the core, windings, and the oil itself.
The core is usually made of high - quality electrical steel. We source this from reliable suppliers, and it can take around 1 - 2 weeks to get the right amount and grade of steel. The windings are made of copper or aluminum, and procuring these materials can also take about 1 - 2 weeks. And then there's the insulating oil. We need to make sure it has the right properties for the transformer, and getting it in can take another week or so.
Overall, the material procurement phase can take anywhere from 3 - 6 weeks, depending on the availability of the materials and any potential supply chain issues.
Manufacturing Process
Now, the actual manufacturing of the transformer. This is a multi - step process that requires a lot of precision.
First, the core is assembled. Workers carefully stack the electrical steel laminations to form the core structure. This step can take about 1 - 2 weeks, depending on the size and complexity of the transformer.


Next, the windings are wound around the core. This is a very delicate process, as the windings need to be wound evenly to ensure proper electrical performance. Winding the windings can take another 1 - 2 weeks.
After that, the transformer is placed in a tank, and the insulating oil is filled in. The tank needs to be sealed properly to prevent any leaks. This final assembly step can take about 1 - 2 weeks as well.
In total, the manufacturing process usually takes around 4 - 6 weeks.
Testing and Quality Assurance
Once the transformer is manufactured, it's not ready to go just yet. We need to make sure it works as expected and meets all the quality standards.
We use a variety of testing equipment, like the Transformer Analyzer. This device helps us analyze the electrical characteristics of the transformer, such as its voltage ratio, impedance, and insulation resistance. We also use the Tap Changer Detector to test the tap changer, which allows us to adjust the voltage output of the transformer. And the Transformer On-load Decomposition Switch Parameter Tester is used to test the on - load decomposition switch.
The testing phase can take about 1 - 2 weeks. We run a series of tests, including no - load tests, short - circuit tests, and dielectric tests. If any issues are found during the testing, we go back and fix them, which can add some extra time to the process.
Delivery
Finally, once the transformer has passed all the tests, it's time to get it to the customer. The delivery time depends on the distance between our factory and the customer's location. For local deliveries, it can take just a few days. But for international shipments, it can take anywhere from 1 - 4 weeks, depending on the shipping method and any customs clearance procedures.
Total Time
So, adding it all up, the total time to customize an energy - saving oil - immersed transformer can range from about 10 - 20 weeks. Of course, this is just an estimate, and the actual time can vary depending on a lot of factors, like the complexity of the design, supply chain disruptions, and any unforeseen issues during the manufacturing or testing process.
If you're in the market for a custom energy - saving oil - immersed transformer, don't hesitate to reach out. We're here to work with you to get the best transformer for your needs in the shortest possible time. Whether you're a small business looking for a compact transformer or a large industrial facility in need of a high - capacity one, we've got the expertise to make it happen. Let's start the conversation and get your project rolling!