Dual Canopy Mechanic Electrical Engineering Co., Ltd. is one of the leading manufacturers and suppliers of Transformer capacity Tester in China. Please feel free to wholesale discount products for sale here and get quotation from our factory. Customized orders are welcome.
What is Transformer capacity Tester?

The Transformer Capacity Tester is a comprehensive performance parameter testing instrument for distribution and power transformers. It can perform on-site measurement and evaluation of core indicators such as rated capacity (kVA), no-load loss (P₀), no-load current (I₀%), load loss (Pk), short-circuit impedance (Uk%), and overall efficiency (η).
Through comprehensive testing, users can:
verify the accuracy and reliability of the transformer's nameplate capacity; assess the loss and efficiency status of operating transformers; identify potential performance-affecting factors such as core aging, winding deterioration, and internal faults; and provide data support for transformer energy-saving retrofits, technical upgrades, and asset assessments.
What is Technical parameters?

Technical parameters
1. Built-in power supply output range
Voltage: 0~10V
Current: 0~10A
2. Characteristic test power supply input range
Voltage: 0~750V
Current: 0~100A
3. Test accuracy
Voltage, current: ±0.2%
Power: ±0.5% (CosΦ>0.1), ±1.0% (0.02
4. Insulation
⑴. Capacity test, voltage, current input point insulation resistance to the housing ≥100MΩ
⑵. Charging power input to the housing withstands 2KV (effective value) of power frequency, test time 1 minute
What are the common application scenarios?
Factory Test: Routine and type tests conducted by the manufacturer.
Acceptance Test: Parameter verification before commissioning of newly installed transformers.
Technical Supervision and Energy Efficiency Assessment: Periodic energy efficiency evaluation of operating transformers by the power grid company.
Energy Saving Retrofit Projects: Comparative measurement of losses and efficiency before and after retrofitting.
Used Transformer Transaction Assessment: Verification of actual capacity and performance between buyers and sellers.
Troubleshooting: Specialized testing for operational anomalies (high temperature/low efficiency/increased losses).
What does pre-sales service include?
Selection Recommendations: Model recommendations are provided based on the transformer capacity (kVA/MVA), voltage level, test items, and on-site power conditions.
Test Solution Design: Wiring diagrams for no-load and load tests, CT selection suggestions, and test procedures are provided.
Energy Efficiency Assessment Solution: For energy-saving renovation projects, before-and-after comparison test solutions and record templates are provided.
Data Support: Product parameter tables, configuration lists, typical test report samples, and tender documents.
Supporting Components: Current sensor/CT kit, voltage test leads, temperature sensor, and data export software.
Our address
Baoding Cloud Center, Hebei, China
Phone Number/whatsapp
+86 13483219412
Salesm@dualcanopy.com

FAQ
Q1: What types of transformers can the Transformer Capacity Tester test?
A: It is suitable for distribution transformers, power transformers, dry-type transformers, etc. Specific capacity and voltage ranges depend on the model.
Q2: What does a high no-load loss (P₀) indicate?
A: Possible causes include core aging, over-magnetization, damaged insulation between core laminations, or partial short circuits. It is recommended to combine this with a core inspection for comprehensive judgment.
Q3: What does a high load loss (Pk) indicate?
A: It is usually related to increased winding resistance (loose connections, insufficient conductor cross-section) or winding short circuits. It is recommended to combine this with DC resistance testing for troubleshooting.
Hot Tags: Transformer capacity Tester, Transformer capacity Testerhina Transformer capacity Tester manufaTransformer capacity Testerturers, suppliers, faTransformer capacity Testertory, Portable Transformer Capacity Characteristic Tester, Transformer capacity And no load test kit
