The composition of the insulation boots withstand voltage test device
A complete set of insulating boots withstand test equipment is an integrated system, and it usually consists of the following core components:
High-voltage power supply unit
Function: Generate the high voltage required for the experiment (up to several tens of kilovolts).
Core: Test transformer, usually with a capacity ranging from 3kVA to 5kVA.
Feature: It should be equipped with an overcurrent protection device, which can automatically and quickly cut off the power supply when the tested item breaks down.
2. Pressure regulating and control unit
Function: Smoothly and continuously adjust the voltage applied to the primary of the test transformer, thereby precisely controlling the output high voltage.
Type:
Traditional manual pressure regulators: Such as autotransformer regulators, they have low cost but require manual operation and have a low level of automation.
Electric pressure regulator: Motor-driven, allowing remote control of pressure increase/decrease.
Fully automatic programmable pressure control: A modern standard, controlled by a microcomputer or PLC, it automatically completes the entire test process according to the preset program.
Insulating boots (gloves) withstand voltage test device
3. Measurement and Display Unit
Function: Real-time monitoring and display of critical test parameters.
Key parameters:
High Voltage (kV): Sampled through a high-voltage divider or high-voltage measurement winding and precisely displayed on the control panel.
Leakage current (mA): By connecting an ammeter in series in the test circuit, this is the key indicator for determining whether the insulating boots are qualified.
Test duration: Automatic timing.
4. Test tank (electrode system)
Function: Safely and reliably install the test subject's insulating boots and form the electrical circuit required for the test.
Structure:
External electrode (cabinet): A metal water tank or stainless steel tank, serving as the grounding electrode. Inside, there is a conductive solution (usually salt water or tap water, with an appropriate amount of salt added to adjust the conductivity).
Inner electrode: A metal plate electrode placed inside the boot or an adjustable metal foot mold, serving as the high-voltage electrode. The inner electrode must have a good contact with the inner wall of the boot. Usually, a conductive solution is injected into the boot to ensure the contact.
Key requirement: The opening of the insulating boots must be higher than the external liquid surface by a certain distance (as stipulated by the standard), to prevent surface flashover.
5. Safety Protection Unit
Function: Ensure the safety of the test personnel.
Measures:
High-pressure cabin door/protective cover: Equipped with an access interlock switch. The high-pressure supply is automatically cut off when the door is opened.
Grounding system: The test tank, equipment casing, etc. must be reliably grounded.
Sound and light alarm: A warning is issued before the test begins and when the high voltage is activated.
Emergency stop button: In case of emergency, it cuts off all power supplies.
6. Data Management and Output Unit (Modern Equipment)
Function: Record, store and print test reports.
Components: Industrial control computer, touch screen, printer, etc. It can automatically record the test voltage, leakage current value and time for each boot, and determine whether it is qualified or not.
Key points for equipment selection
When choosing an insulation boot withstand voltage test device, the following factors need to be comprehensively considered:
Compliance (primary):
The equipment must meet or exceed the latest national standards, namely GB/T 17622-202X "Insulating Gloves, Boots and Socks for Live Working", DL/T 976-2017 "Preventive Test Procedures for Live Working Tools, Devices and Equipment", as well as the technical requirements stipulated in the power safety regulations.
Technical Specifications:
Maximum output voltage: Must cover the maximum test voltage of the insulating boots. The factory test voltage of the insulating boots is usually 20kV, and the preventive test voltage is 15kV. It is recommended that the maximum output of the equipment be ≥ 25kV, leaving some margin.
Output capacity (kVA): Determines the load-carrying capacity and whether voltage stability can be maintained during breakdown. For testing multiple pairs of boots or large-sized boots simultaneously, it is recommended that the capacity be ≥ 3kVA.
Leakage current measurement accuracy: This is a crucial indicator. The standard requires that it can accurately measure up to the 10mA level, with an accuracy of ±(1% of reading + 2 digits) or higher.
Voltage measurement accuracy: Generally, it is required to be no less than 1.5 grade.
Degree of Automation:
Manual/Auto Semi-Auto/Full Automatic: The fully automatic equipment can automatically complete the processes of voltage boosting, timing, voltage reduction, discrimination and recording. It has high efficiency and low human error, and is suitable for units with large detection volumes and the need for standardized management (such as power companies, large enterprises). The manual equipment is suitable for scenarios with small volumes and limited budgets.
Test efficiency and number of channels:
Single station vs. Multiple stations: The device can be designed to test one pair or multiple pairs (such as 2, 4, or 6 pairs) of insulated boots at a time. The multi-station device can significantly increase work efficiency, but it is more costly.
Safety and Reliability:
It is necessary to check whether the access control interlock, overcurrent protection, reliable grounding, and emergency stop function are all in good condition.
The insulation performance and anti-interference capability of the equipment itself should be strong.